DPD parcel distribution centre in Kaiserslautern

Object location

Kaiserslautern

Service scope

Turnkey

Building type

Distribution centre

Floor space

6,600 m²

Measurements

136 / 43 m / 10,20 m

Construction period

Feb 2025 – Nov 2025

Object description

The developer, Skipiol Immobilien GbR, has commissioned BREMER Karlsruhe GmbH to construct a new parcel distribution centre in Kaiserslautern for its future tenant, DPD.

The facility will be delivered with a BREEAM “Very Good” certification, ensuring high standards of sustainability and environmental performance. The building will be constructed on a site of approximately 31,000 m² and will comprise a 5,700 m² column-free warehouse, built using precast concrete construction, providing maximum operational flexibility.

The facility will feature 68 sectional loading doors and one high-speed door, designed to accommodate a wide range of vehicle types, from vans and 12-tonne trucks to jumbo swap bodies. Continuous rooflight bands above the loading doors will provide ample natural daylight, creating a pleasant working environment.

An office wing of approximately 750 m² will be integrated into the warehouse at ground-floor level. With a total gross floor area of approximately 6,500 m², the development will provide 154 jobs operating on a shift basis.

A photovoltaic system will be installed on the roof, while the roof itself will be designed as a green roof. In addition, the gable façade will incorporate a vertical greening system. The entire facility will be protected by a sprinkler system, with the sprinkler water tank installed underground outside the building.

The external works will include 29 EV charging points and 4 fast-charging stations to support the environmentally conscious operation of DPD’s vehicle fleet. These charging facilities will be installed directly by the tenant. The site will also provide a total of 81 car parking spaces and 26 bicycle parking spaces.

Construction commenced in mid-February 2025, with completion scheduled for the end of November 2025.

This is a technically complex project with a demanding construction programme and schedule.

Location

Karlsruhe

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

SEGRO logistics park Berlin
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing
FRICKE Group logistics centre Tholey
  • Head office Paderborn
  • Logistics Buildings
  • Completed
ALCARO logistics centre Köln
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing