Skip to main content Skip to page footer

FB FOOD Hüfingen

Object location

Hüfingen

Service scope

Turnkey

Building type

Production Facility

Floor space

5.590 m²

Measurements

56 / 59 / 13,30 m

Construction period

Mar. 2016 to Dec. 2016

Object description

The building is being constructed as a three-story structure. The production areas are located on the ground floor and the first floor, while the office and social areas are spread across all three floors, from the ground floor to the second floor. The building is being built to the KfW 70 energy efficiency standard. The staircases are made from precast concrete elements.

Location

Stuttgart

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

Chefs Culinar Logistikzentrum Bueren
  • Head office Paderborn
  • Cold Storage Facilities
  • Ongoing
FOUR PARX Gewerbecampus Muenchen-Kirchheim
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing
R+M Suttner Produktions- und Entwicklungsstandort Lemgo
  • Head office Paderborn
  • Office Buildings
  • Completed