Goodman Logistics Centre Dornstadt
Object location
Dornstadt
Service scope
Turnkey
Building type
Logistics Building
Floor space
20.765 m²
Measurements
151 / 121 / 14,00 m
Construction period
Jan. 2015 to Oct. 2015
Object description
An axis of the existing building is being reinforced as a fire wall. To elevate the building to the required level, approximately 65,000 m³ of earthworks are necessary. The building includes a two-story office at the front. The hall's structure is made of precast reinforced concrete elements and features a height variation in the roof. Additionally, an automated small parts storage area is being implemented on a mezzanine level, which has a depth of 12 meters and a total area of 4,500 m².
Special features
Expansion of the logistics building originally constructed in 2011, including extensive earthworks.