Goodman Logistics Centre Dornstadt

Object location

Dornstadt

Service scope

Turnkey

Building type

Logistics Building

Floor space

20.765 m²

Measurements

151 / 121 / 14,00 m

Construction period

Jan. 2015 to Oct. 2015

Object description

An axis of the existing building is being reinforced as a fire wall. To elevate the building to the required level, approximately 65,000 m³ of earthworks are necessary. The building includes a two-story office at the front. The hall's structure is made of precast reinforced concrete elements and features a height variation in the roof. Additionally, an automated small parts storage area is being implemented on a mezzanine level, which has a depth of 12 meters and a total area of 4,500 m².

Special features

Expansion of the logistics building originally constructed in 2011, including extensive earthworks.

Location

Head office Paderborn

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

SEGRO Logistikpark Berlin
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing
FRICKE Gruppe Logistikzentrum Tholey
  • Head office Paderborn
  • Logistics Buildings
  • Completed
ALCARO logistics centre Köln
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing