Goodman Logistics Centre Leipzig

Object location

Leipzig

Service scope

Turnkey

Building type

Logistics Building

Floor space

18.000 + 21.000 + 11.000 m²

Measurements

170 / 120 / 12,50 m

Construction period

Mar. 2013 to Sep. 2013

Object description

Extensive earthworks are necessary to construct the planned buildings (Unit1-2/Unit3-5/Unit6). In the first construction phase, units 3-5 with 21,000 m² and the entire ground leveling work will be completed. This will be followed by Unit 6 with 11,000 m² as the 2nd construction phase and finally Unit 1+2 with 18,000 m² as the 3rd construction phase. The entire construction consists of a BREMER prefabricated reinforced concrete structure with trapezoidal sheet metal cladding. The façade is divided into a reinforced concrete sandwich base and a steel ISO façade above. In front of the logistics complex is a 2-storey office building. For reasons of sustainability, the entire building is heated by a wood pellet heating system in conjunction with underfloor heating. The overall project consists of 3 construction phases. The 1st BA consists of units 3 to 5.

Location

Head office Paderborn

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

SEGRO Logistikpark Berlin
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing
FRICKE Gruppe Logistikzentrum Tholey
  • Head office Paderborn
  • Logistics Buildings
  • Completed
ALCARO logistics centre Köln
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing