Skip to main content Skip to page footer

Goodman Logistics Centre Rheinberg

Object location

Nürnberg

Service scope

Turnkey

Building type

Logistics Building

Floor space

12.000 m²

Measurements

139 / 85 / 13,95 m

Construction period

Feb. 2015 to Jul. 2015

Object description

The warehouse building comprises an approx. 8,000 m² dry warehouse with empties area as well as two frozen and refrigerated areas, each approx. 2,000 m² in size, and is divided into two fire compartments. The refrigerated area also houses so-called chicken boxes, which are specially designed to meet the needs of the customers to be supplied. At the front of the complex, 18 loading units are connected to the transshipment hall. The administration and social building also planned in this area has a gross floor area of approx. 440 m² and is 2-storey.

BREMER AG is carrying out the entire project, including the outdoor facilities and refrigeration technology, on a turnkey basis.

Special features

Flexible use from deep-freezing and refrigeration to dry storage. A multifunctional logistics building with an integrated refrigerated and deep-freeze area. The building was awarded the DGNB certificate in "Silver".

Location

Head office Paderborn

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

SEGRO Logistikpark Berlin
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing
FRICKE Gruppe Logistikzentrum Tholey
  • Head office Paderborn
  • Logistics Buildings
  • Completed
ALCARO logistics centre Köln
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing