Skip to main content Skip to page footer

Greenfield Production Facility Mühlacker

Object location

Mühlacker

Service scope

Turnkey

Building type

Production Facility

Floor space

25.250 m²

Measurements

216 / 120 / 14 m

Construction period

Mar. 2017 to Dec. 2017

Object description

A production hall is being built on the approx. 45,770 m² site in Mühlacker. The overall project consists of a hall measuring 24,200 m² in total, which will be used as a production and logistics area. The social areas are housed in the 2-storey office with an area of 600 m² and the 460 m² of office fittings in the hall. The hall is to be loaded via 4 high-speed doors and the 4 dock levellers. For the intensive production processes, 2 transformers with a total output of 5000 kVA and an area-wide lighting system with 500 lux will be installed.

Location

Head office Paderborn

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

Chefs Culinar Logistikzentrum Bueren
  • Head office Paderborn
  • Cold Storage Facilities
  • Ongoing
FOUR PARX Gewerbecampus Muenchen-Kirchheim
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing
R+M Suttner Produktions- und Entwicklungsstandort Lemgo
  • Head office Paderborn
  • Office Buildings
  • Completed