Skip to main content Skip to page footer

HOBART Production Facility Offenburg

Object location

Offenburg

Service scope

Turnkey

Building type

Production Facility

Floor space

10.815 m²

Measurements

133 / 117 / 9,50 m

Construction period

Apr. 2019 to Dec. 2019

Object description

BREMER is building the site extension in Offenburg on behalf of HOBART GmbH, a subsidiary of the ITW Group. The production hall with a technical gallery and office/social facilities consists of ISO sandwich elements, saddle light strips, mullion-transom façades, FPO roof waterproofing on perforated acoustic trapezoidal sheet metal profiles, concrete core activation for heating and cooling temperature control and a ventilation system. This is where the world market leader produces and assembles the latest generations of commercial dishwashing machines and systems. The office building in solid construction also consists of a ventilation system, underfloor heating and a VRF system. The façade is made of concrete sandwich elements and aluminum glazing including external venetian blinds.

Location

Stuttgart

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

Chefs Culinar Logistikzentrum Bueren
  • Head office Paderborn
  • Cold Storage Facilities
  • Ongoing
FOUR PARX Gewerbecampus Muenchen-Kirchheim
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing
R+M Suttner Produktions- und Entwicklungsstandort Lemgo
  • Head office Paderborn
  • Office Buildings
  • Completed