Skip to main content Skip to page footer

Kühne + Nagel Logistics Centre Straubing

Object location

Straubing

Service scope

Turnkey

Building type

Logistics Building

Floor space

12.100 m²

Measurements

199 / 50 / 15,45 m

Construction period

Jan. 2018 to Jan. 2019

Object description

BREMER Ingolstadt GmbH is constructing another logistics building for the user Kühne + Nagel and the client property team from Hamburg.
On an area of approx. 55,000 m² near the Danube in the immediate vicinity of Straubing, a transshipment hall and a 4-storey office building, connected by a 2-storey connecting building, are being constructed on a turnkey basis including all outdoor facilities.
As the hall was designed to be column-free, trusses with a span of 50 m were once again used.
 

Location

Ingolstadt

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

Baur Hermes Fulfilment Shuttle-Lager Altenkunstadt
  • Ingolstadt
  • Logistics Buildings
  • Completed
GIP Grundig LOG Nürnberg
  • Ingolstadt
  • Logistics Buildings
  • Ongoing
VALOR Logistikzentrum Ahrensfelde
  • Berlin-Brandenburg
  • Building in existing struktures
  • Ongoing