Skip to main content Skip to page footer

Nobilia Production Facility Verl

Object location

Verl

Service scope

Precast Elements

Building type

Production Facility

Floor space

13.280 m²

Measurements

166 / 80 / 10,00 m

Construction period

Jul. 2009 to Aug. 2010

Object description

BREMER is overbuilding the oldest halls of the Nobilia company in Verl. The dismantling of the existing halls, which consist of a wooden construction with trapezoidal sheet metal roofing and a bitumen warm roof, will take place after they have been built over. The height of the old hall is 5.70 m. The new building has a height of 10 m with a grid of 20.0 x 18.75 m. The façade of the newly built factory hall consists of BREMER concrete sandwich elements in which aluminum windows are installed. The building also has thirteen roller shutters with approach aprons and a fixed loading edge. The roof made of trapezoidal sheets and foils with 140 mm insulation is equipped with 1700 m² of light strips and a vacuum roof drainage system.

Special features

The superstructure will be built while the existing hall is in full operation. The foundation work as well as the assembly of the prefabricated construction and the subsequent dismantling of the existing wooden hall will take place during the company's production breaks (summer vacation, Christmas and Easter). The prefabricated parts will be assembled using one of the largest mobile cranes in Germany, a 1,200-ton telescopic ramp crane.

Location

Head office Paderborn

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

SEGRO Logistikpark Berlin
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing
FRICKE Gruppe Logistikzentrum Tholey
  • Head office Paderborn
  • Logistics Buildings
  • Completed
ALCARO logistics centre Köln
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing