WEIDENHAMMER Production Facility Zwenkau
Object location
Zwenkau
Service scope
Turnkey
Building type
Production Facility
Floor space
Hall: 9.200 m², Office: 1.170 m²
Measurements
67/60/10,0 + 55/68/13,0 + 48/31/13,0 + 73/8/8,1 m
Construction period
Sep. 2011 to Mar. 2012
Object description
BREMER AG is building for the Weidenhammer company for the second time. This is the new construction of the 1st construction phase of a production and warehouse building as a prefabricated reinforced concrete construction: The facade of the hall consists of an ISO facade. The roof construction consists of trapezoidal sheet metal with insulation and sealing. The two-storey office building in front is connected to the hall in a prefabricated reinforced concrete construction. The halls are divided by fire walls. The production area is equipped with crane runway systems. The production heat is fed into the building via a heat recovery system. A PV system will be installed on the roof to generate electricity. The system is designed for a 2nd construction phase as an extension.
Stuttgart
You are impressed by our reference and would like to know which BREMER office managed this project?
Learn more