Skip to main content Skip to page footer

XXXLutz Logistics Buildings Uffenheim

Object location

Uffenheim

Service scope

Turnkey

Building type

Logistics Buildings

Floor space

42.700 m²

Measurements

117 / 180 / 20,2 m

Construction period

Jun. 2015 to Nov. 2015

Object description

Yet another contract carrying forward a long-standing business relationship. The extension of the XXXLutz central warehouse consists of 3 hall sections separated by fire walls. Apart from featuring generous areas for receiving and despatch operations with a total of 64 docks, the building also includes multiple stacked mezzanine levels. Some accommodate offices and ancillary rooms, others – with double-T slabs for greater strength – are used for logistical purposes. The storage area is designed for a conventional warehouse and a narrow-aisle warehouse with extra-even surfaces and clear heights of more than 16 m. The entire building consists of precast elements made at BREMER's own production plants. The facility is realised as a turnkey project including all technical installations and all exterior facilities, for which approx. 80,000 cbm of earth first needs to be moved.

Das Logistikzentrum der Extraklasse

Location

Head office Paderborn

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

Baur Hermes Fulfilment Shuttle-Lager Altenkunstadt
  • Ingolstadt
  • Logistics Buildings
  • Completed
GIP Grundig LOG Nürnberg
  • Ingolstadt
  • Logistics Buildings
  • Ongoing
VALOR Logistikzentrum Ahrensfelde
  • Berlin-Brandenburg
  • Building in existing struktures
  • Ongoing