Aldi Nord Warehouse Lingen

Object location

Lingen

Service scope

Building in existing structures

Building type

Logistics buildings

Floor space

10.000 m²

Measurements

77 / 121 / 12,40 m

Construction period

January 2022 to April 2023

Object description

The 10,000 m² new building offers both a dry goods warehouse and a cold storage area with an attached frozen food area. The special feature: If necessary, the new dry storage facility can be converted into an additional cold storage facility.

At the same time, BREMER carried out extensive work on the existing property on around 7,500 m². The previous fresh meat and frozen food storage facility was converted into a fruit and vegetable and dry storage facility. The support office was expanded into the existing structure as a wooden frame structure. The break room and the associated kitchen were also expanded. Further work was carried out outside, including the dismantling of a rain retention basin.ebaut.

Special features

  • Different temperature zones: from the drying hall (+17°C) to fruit and vegetables, cold storage, fresh meat to the frozen storage warehouse (-24 to -28°C).
  • Modernization of the existing electrical system on 22,500 m²
Location

Head office Paderborn

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

Stadt Büren Feuerwehrhaus Steinhausen
  • Head office Paderborn
  • Building in existing struktures
  • Ongoing
Stadt Büren Feuerwehrhaus Hegensdorf
  • Head office Paderborn
  • Building in existing struktures
  • Ongoing
R+M Suttner Produktions- und Entwicklungsstandort Lemgo
  • Head office Paderborn
  • Office Buildings
  • Completed