Skip to main content Skip to page footer

Deutsche Post DHL MechZB 60 in Paderborn

Object location

Paderborn

Service scope

Turnkey

Building type

Logistics Building

Floor space

4.560 m²

Measurements

108 / 45 / 9,55 m

Construction period

October 2017 to June 2018

Object description

The concept of the building, like all of the user's distribution centers, is modular in design and can be flexibly adapted to the local requirements of the distribution area. The transshipment hall features 42-meter-long reinforced concrete beams that span the hall, where the sorting system is located, without any supports. BREMER's precise construction planning and on-time execution ensure that the complex conveyor technology can be installed early in the process, significantly reducing the overall construction time.

The facade features a reinforced concrete sandwich base with a steel ISO facade above it in the company colors, along with a band of windows. The two-story office building has a total floor area of 540 m².

Initially, earthworks are required to level a height difference of up to 5.0 meters on the site. All rainwater from the roof surfaces is absorbed on the property through infiltration.

Location

Head office Paderborn

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

SEGRO logistics park Berlin
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing
FRICKE Group logistics centre Tholey
  • Head office Paderborn
  • Logistics Buildings
  • Completed
ALCARO logistics centre Köln
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing