Skip to main content Skip to page footer

Fire station city of Warstein Mülheim-Sichtigvor and Suttrop

Object location

Warstein

Service scope

turnkey

Building type

fire station

Floor space

880 m² and 795 m²

Construction period

Jan. 2027-Sep. 2027

Object description

For the City of Warstein, BREMER West is delivering two new fire stations in the districts of Mülheim-Sichtigvor and Suttrop. The scope of services includes turnkey construction as well as the preparation and submission of planning applications.

Both fire stations are being designed and constructed to an almost identical specification. The key difference is that the fire station in Suttrop will provide three appliance bays, whereas the facility in Mülheim-Sichtigvor will accommodate four.

In addition, the following features are included:

  • Mechanical ventilation and extraction systems in the welfare and staff areas
  • Integration of an emergency backup power system
  • Outdoor washing bay for emergency vehicles
  • High-quality facade design for the vehicle halls, ensuring harmonious integration into the respective local surroundings
Location

Head office Paderborn

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

Stadt Büren Feuerwehrhaus Steinhausen
  • Head office Paderborn
  • Fire station
  • Ongoing
Stadt Büren Feuerwehrhaus Hegensdorf
  • Head office Paderborn
  • Fire station
  • Ongoing
[Translate to English:]
Stadt Brakel Feuerwehrhaus
  • Head office Paderborn
  • Fire station
  • Ongoing