Lorenz Bahlsen Production Hall Hankensbüttel
Object location
Hankensbüttel
Service scope
Turnkey and Revitalisation
Building type
Production hall with office building
Floor space
3.879 m²
Measurements
63 / 32 / 15 m
Construction period
June 2025 - June 2026
Object description
The team at BREMER Nord GmbH is constructing a new production hall with office space for the food manufacturer Lorenz Bahlsen.
Project Features & Challenges:
Demolition of the existing halls, followed by reassembly on the company premises – whilst operations continue.
Due to the nature of the food industry, very high hygiene standards apply. Small building site: the new hall must be cleverly integrated into existing structures.
Flooring solution: a fully coated floor with high slip resistance that is also very easy to clean – a key requirement in food production.
Integration of logistics areas with offices – functional, efficient and future-oriented.
The new hall is optimally designed for logistics processes, improving material flow and working conditions – without interrupting ongoing operations.
The construction period is 12 months.
Construction webcam
Hamburg
You are impressed by our reference and would like to know which BREMER office managed this project?
Learn moreSimilar projects