Aldi Nord warehouse Lingen

Object location

Lingen

Service scrope

Building in existing structures

Building type

Logistics buildings

Floor space

10.000 m²

Measurements

77 / 121 / 12,40 m

Construction period

January 2022 - April 2023

Object description

The 10,000 m² new building offers both a dry goods warehouse and a cold storage area with an attached frozen food area. The special feature: If necessary, the new dry storage facility can be converted into an additional cold storage facility.

At the same time, BREMER carried out extensive work on the existing property on around 7,500 m². The previous fresh meat and frozen food storage facility was converted into a fruit and vegetable and dry storage facility. The support office was expanded into the existing structure as a wooden frame structure. The break room and the associated kitchen were also expanded. Further work was carried out outside, including the dismantling of a rain retention basin.ebaut.

Special features

  • Different temperature zones: from the drying hall (+17°C) to fruit and vegetables, cold storage, fresh meat to the frozen storage warehouse (-24 to -28°C). 
  • Modernization of the existing electrical system on 22,500 m²
Location

Head office Paderborn

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

Ehlert Erweiterung und Umbau Lagerhalle Verl
  • Head office Paderborn
  • Building in existing struktures
  • Completed
EDEKA Kühlhaus Wiefelstede
  • Head office Paderborn
  • Building in existing struktures
  • Completed
Haver Kranbahnhalle Ahlen
  • Head office Paderborn
  • Building in existing struktures
  • Completed