
Rewe Conversion of Existing Warehouse Stelle
Object location
Stelle
Service scope
Turnkey, Building in Existing Structures
Building type
Cold Storage Facilities
Floor space
25.000 m²
Measurements
310 / 120 / 13 m
Construction period
June 2022 to July 2023
Object description
Rewe commissioned BREMER to convert the existing warehouse in Stelle. Various cooling zones for fruit, vegetables and meat products as well as freezer cells are being built at the warehouse, which has 25,000 m² of floor space and ensures supplies to the region's consumer markets. This is the second order for BREMER at the location.
Special features
All renovation work will be carried out during ongoing operations. In order to disrupt operational processes as little as possible, the construction phases are divided in close coordination with Rewe. Another special feature is the dismantling of the sprinkler tank and conversion into a forklift charging station.

Head office Paderborn
You are impressed by our reference and would like to know which BREMER office managed this project?
Learn moreSimilar projects


