Skip to main content Skip to page footer

Aliaxis Production Facility Mannheim

Object location

Mannheim

Service scope

Turnkey

Building type

Office and Production Facilities

Floor space

3.400 m²

Measurements

65 / 52 / 12,60 m

Construction period

November 2023 to September 2024

Object description

Aliaxis is a leading provider of advanced plastic pipe systems for building construction, civil engineering, industrial applications, and agriculture. BREMER Karlsruhe GmbH is constructing a new, modern, and sustainable production hall with an attached office building for Aliaxis at their Mannheim location.

The approximately 3,500 m² production hall will be equipped with a large-scale photovoltaic system for power generation. Sustainable rainwater retention will be achieved through a retention green roof.

Location

Karlsruhe

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

GIP Grundig LOG Nürnberg
  • Ingolstadt
  • Logistics Buildings
  • Ongoing
GRITEC Produktion + Büro
  • Karlsruhe
  • Office Buildings
  • Completed
AMB Logistics Hall Hamburg
  • Head office Paderborn
  • Production Facilities
  • Completed