Aliaxis Production Facility Mannheim
Object location
Mannheim
Service scope
Turnkey
Building type
Office and Production Facilities
Floor space
3.400 m²
Measurements
65 / 52 / 12,60 m
Construction period
November 2023 to September 2024
Object description
Aliaxis is a leading provider of advanced plastic pipe systems for building construction, civil engineering, industrial applications, and agriculture. BREMER Karlsruhe GmbH is constructing a new, modern, and sustainable production hall with an attached office building for Aliaxis at their Mannheim location.
The approximately 3,500 m² production hall will be equipped with a large-scale photovoltaic system for power generation. Sustainable rainwater retention will be achieved through a retention green roof.
Oliver Grabowsky
»Als Generalunternehmer errichten wir die neue Produktionshalle schlüsselfertig und sorgen dafür, dass Aliaxis sich auch während der Bauphase voll auf das Kerngeschäft konzentrieren kann.«
Karlsruhe
You are impressed by our reference and would like to know which BREMER office managed this project?
Learn more