Aliaxis Production Facility Mannheim

Object location

Mannheim

Service scope

Turnkey

Building type

Office and Production Facilities

Floor space

3.400 m²

Measurements

65 / 52 / 12,60 m

Construction period

November 2023 to September 2024

Object description

Aliaxis is a leading provider of advanced plastic pipe systems for building construction, civil engineering, industrial applications, and agriculture. BREMER Süd is constructing a new, modern, and sustainable production hall with an attached office building for Aliaxis at their Mannheim location.

The approximately 3,500 m² production hall will be equipped with a large-scale photovoltaic system for power generation. Sustainable rainwater retention will be achieved through a retention green roof.

Special features

A special feature of the new building, which covers approximately 3,400 m², is its overhead crane runway system equipped with double-girder bridge cranes. Another notable feature is the air handling system (HVAC system), designed to manage exceptionally large supply and exhaust air volumes. The system circulates air at an impressive flow rate of 143,000 m³ per hour.

The production facility also stands out in terms of sustainability. A large-scale photovoltaic system installed on the roof generates renewable electricity, while a sustainable retention green roof provides effective rainwater management by temporarily storing and regulating stormwater runoff.

Location

Karlsruhe

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

Chefs Culinar Logistikzentrum Bueren
  • Head office Paderborn
  • Cold Storage Facilities
  • Ongoing
FOUR PARX Gewerbecampus Muenchen-Kirchheim
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing
R+M Suttner Produktions- und Entwicklungsstandort Lemgo
  • Head office Paderborn
  • Office Buildings
  • Completed