Skip to main content Skip to page footer

Capri Sonne Production Facility Eppelheim

Object location

Eppelheim

Service scope

Extended Shell Construction

Building type

Production Facility

Floor space

9.625 m²

Measurements

150 / 100 / 16,00 m

Construction period

September 2013 - June 2014

Object description

The second construction phase consists of four separate buildings: HPW 4 to 7. These include a three-story logistics building with an office and social block on the upper floor, a three-story technical and supply building, a high-bay warehouse, and a transport bridge. A specialized foundation is required for the high-bay warehouse floor, which has a thickness of 1.00 meter and an area of 5,500 m². The entire structure is made of precast reinforced concrete elements produced by BREMER. Due to the regulations of the food industry, all trades must meet heightened execution standards. The architecture of the building aligns with the company’s corporate identity (CI), which is applied consistently worldwide.

Special features

ACCORDING TO FOOD INDUSTRY GUIDELINES – After the successful and on-schedule completion of the first construction phase to the client's satisfaction, Wild has immediately commissioned us to proceed with the second construction phase.

Location

Head office Paderborn

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

Chefs Culinar logistics centre Büren
  • Head office Paderborn
  • Cold Storage Facilities
  • Ongoing
FOUR PARX business campus Munich
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing
Reifen Müller Flagshipstore Stockstadt
  • Karlsruhe
  • Office Buildings
  • Completed