DFI distribution centre and office building in Kandel

Object location

Kandel

Service scope

Turnkey

Building type

Distribution and office building

Floor space

17,500 m²

Measurements

205 / 85 m

Construction period

April 2025 – February 2026

Object description

For DFI Real Estate, BREMER Süd successfully delivered a modern distribution centre in Kandel. Built on a site of approximately 30,000 square metres on Industriestraße, the forward-looking logistics facility provides a total gross floor area of around 17,500 square metres. The project was completed on schedule in the first quarter of 2026.

The building was specifically designed to meet the demands of high-performance fresh food logistics. In addition to extensive warehouse space, the development incorporates modern office accommodation and mezzanine areas. At the heart of the project is a comprehensive energy concept focused on efficiency and the responsible use of resources.

A key feature is the rooftop photovoltaic system with a capacity of approximately two megawatts, contributing significantly to the facility’s on-site energy supply. Through a tenant electricity model, the solar power generated can be utilised directly by occupants. Further sustainability measures include green roofs and façades, a landscaped acoustic barrier, and a dedicated ecological buffer zone for flora and fauna, ensuring the development is harmoniously integrated into its surroundings. DFI Real Estate is aiming to achieve DGNB Gold certification (Version 2023) for the project.

With the successful completion of this development, BREMER Süd once again demonstrates its expertise in delivering sustainable and future-ready logistics facilities.

Special features

  • Site area: approx. 30,000 m²
  • Total floor area: approx. 17,500 m²
  • 15,500 m² of warehouse space, plus 1,000 m² of mezzanine space and 1,000 m² of office space
  • Completion scheduled for Q1 2026
  • Photovoltaic system with an output of approx. 2 MW for on-site power generation
  • Implementation of a tenant electricity model
  • DGNB Gold certification (Version 2023) targeted
  • Green roof and façade areas, complemented by ecological compensation measures
  • Comprehensive energy-efficient building concept with a strong focus on environmental performance

Nachhaltiges Distributionszentrum für DFI in Kandel realisiert

Location

Stuttgart

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

HEIDERBECK Logistics Facility, Olching
  • Stuttgart
  • Cold Storage Facilities
  • Completed
[Translate to English:]
Chefs Culinar logistics centre Büren
  • Head office Paderborn
  • Cold Storage Facilities
  • Ongoing
Innstolz cold storage logistics centre and office building in Deggendorf
  • Ingolstadt
  • Cold Storage Facilities
  • Ongoing