HEIDERBECK Logistics Facility, Olching

Object location

Olching-Geiselbullach, Bavaria

Service scope

Turnkey

Building type

Multi-storey logistics facility

Floor space

Ground floor: approx. 1,110 m², First floor: approx. 1,110 m², Total: approx. 2,220 m²

Measurements

Building dimensions: 40.67 / 27.28 m, Ground floor clear height: approx. 6.50 m, First floor clear height: approx. 3.00 m

Construction period

August 2025 – March 2026

Object description

For HEIDERBECK GmbH, BREMER Süd delivered the turnkey extension of the existing company premises in Olching-Geiselbullach. The project comprised a two-storey logistics facility extension including a chilled storage hall, stairwell core, lift system and technical plant areas, as well as a dry storage area with a battery room on the upper floor.

The development provides approximately 2,220 m² of gross floor area, creating modern warehousing capacities for food and frozen-food logistics. The chilled storage hall was designed for temperatures of +4°C and complemented by frozen storage areas operating at temperatures down to -18°C.

A particular challenge was the execution of all construction works while the facility remained fully operational. Throughout the entire construction period, from August 2025 to March 2026, existing production and logistics processes continued without disruption. Key project components included integration with the existing sprinkler infrastructure, modifications to the fire service access route, and the implementation of the requirements of the international IFS (International Featured Standards) framework for food logistics.

The building envelope was constructed using insulated cold-store panels, architecturally aligned with the existing facility. A green roof incorporating a photovoltaic system completed the forward-looking building concept.

Location

Stuttgart

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

[Translate to English:]
Chefs Culinar logistics centre Büren
  • Head office Paderborn
  • Cold Storage Facilities
  • Ongoing
DFI distribution centre and office building in Kandel
  • Stuttgart
  • Cold Storage Facilities
  • Completed
Innstolz cold storage logistics centre and office building in Deggendorf
  • Ingolstadt
  • Cold Storage Facilities
  • Ongoing