Skip to main content Skip to page footer

EN Neukirch Production Facility Hannover

Object location

Hannover

Service scope

Turnkey

Building type

Production Facility

Floor space

2.600 m²

Measurements

49 / 40 / 10,0 m

Construction period

Aug. 2015 to Mar. 2016

Object description

The production and storage building is divided into two sections and features two loading units as well as a large ground-level gate. The clear storage height is 7.5 meters. On the street side, there is a two-story office extension with a small company canteen.

Location

Hamburg

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

Recon production facility Soest
  • Head office Paderborn
  • Building in existing struktures
  • Completed
[Translate to English:]
mateco workshop hall with office and sanitary facilities in Essen
  • Stuttgart
  • Building in existing struktures
  • Completed
Chefs Culinar logistics centre Büren
  • Head office Paderborn
  • Cold Storage Facilities
  • Ongoing