Skip to main content Skip to page footer

greenfield Logistics Centre Vaihingen-Ost

Object location

Vaihingen-Ost

Service scope

Turnkey

Building type

Logistics Building

Floor space

42.125 m²

Measurements

370 / 108 / 12,5 m

Construction period

Aug. 2013 to Mar. 2014

Object description

The logistics center is divided into 5 hall sections and two office extensions. Within the halls, 3,000 m² of mezzanine space will be built. The entire construction consists of prefabricated reinforced concrete elements manufactured in Paderborn and transported by rail to southern Germany. The façade of the logistics center impresses with its accentuated green coloring. In order to ensure sustainability, LED technology is used for some of the lighting. The roof is pre-equipped for the installation of a photovoltaic system. A partial area of 10,000 m² will be handed over after just 4 months.

Special features

Following successful projects, Greenfield is once again relying on BREMER as its general contractor.

Location

Head office Paderborn

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

SEGRO Logistikpark Berlin
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing
FRICKE Gruppe Logistikzentrum Tholey
  • Head office Paderborn
  • Logistics Buildings
  • Completed
ALCARO logistics centre Köln
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing