Skip to main content Skip to page footer

greenfield Production Facility Achern

Object location

Achern

Service scope

Turnkey

Building type

Production Facility

Floor space

12.140 m²

Measurements

108 / 105 / 12,45 m + 15 / 55 / 12,45 m

Construction period

Aug. 2015 to Feb. 2016

Object description

The production building consists of 3 production areas including a mezzanine with a total area of 8,175 m², a storage area of around 3,215 m² and an extension with workshop, technical, office and social areas of around 810 m². The sections are separated by fire walls and system walls. The building consists of a reinforced concrete construction. The individual hall sections can be accessed via high-speed doors. There are 8 loading units. The office area, with a representative entrance area, is located on the ground floor.

Location

Head office Paderborn

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

GIP Grundig LOG Nürnberg
  • Ingolstadt
  • Logistics Buildings
  • Completed
GRITEC Produktion + Büro
  • Karlsruhe
  • Office Buildings
  • Completed
AMB Logistics Hall Hamburg
  • Head office Paderborn
  • Production Facilities
  • Completed