Haver Crane Runway Hall Ahlen
Object location
Ahlen
Service scope
Turnkey
Building type
Building in Existing Structures
Floor space
8.950 m²
Measurements
255 / 35 / 12,00 m
Construction period
Oct. 2022 to Mar. 2023
Object description
BREMER is building an 8950 m² crane runway hall for the company Wilhelm Haver & Sohn. The new building offers capacity for up to 300,000 tons of steel coils. The special feature: the crane runway hall has its own siding so that trains can enter the hall for loading and unloading.
Location
Head office Paderborn
You are impressed by our reference and would like to know which BREMER office managed this project?
Learn more