Alpha Logistics Centre Obertshausen
Object location
Obertshausen
Service scope
Turnkey
Building type
Logistics Building
Floor space
11.000 m²
Measurements
126 / 90 / 9,5 m
Construction period
July 2013 to February 2014
Object description
The building is divided into a commercial hall with a total of four attached office extensions, two on each of the opposing longitudinal sides of the hall. A fire wall divides the commercial hall into two equally sized sections. The entire structure of the building is made of BREMER precast reinforced concrete elements with trapezoidal sheet metal roofing and a façade cladding of horizontal steel insulated panels. Reinforced concrete sandwich elements form the base of the façade.
Special features
Bremer is building for the company Alpha Industrial for the first time.
Head office Paderborn
You are impressed by our reference and would like to know which BREMER office managed this project?
Learn moreSimilar projects