Apfelböck logistics centre in Mamming (western expansion)

Object location

Mamming

Service scope

Turnkey

Building type

Logistics centre

Floor space

20,000 m²

Measurements

133 / 150 / 7,5–12 m

Construction period

April 2023 – Dec 2023

Object description

With the westward expansion of the VZ3 logistics centre in Mamming, approximately 20,000 m² of additional, flexibly usable logistics space has been created, making a significant contribution to strengthening high-frequency 24/7 supply chain operations. The extension was completed within a short timeframe and integrated seamlessly into ongoing operations.

At the heart of the project is a 142.5-metre-long and 20-metre-wide loading tunnel, capable of accommodating up to five lorries simultaneously. It is complemented by a 1,500 m² column-free canopy with generous clear heights of at least 5 metres. This robust structure enables efficient transhipment operations regardless of weather conditions or throughput levels.

The storage of high-voltage batteries presented particular challenges. To address these requirements, specially secured storage areas were created, equipped with FM Global sprinkler protection, automatic early fire detection, and a WHG-compliant firewater retention system. As a result, the new facility meets the highest safety standards for modern energy storage logistics.

The warehouse structure itself has been designed for maximum load-bearing capacity and operational flexibility. A 15 × 15 metre column grid, clear internal heights ranging from 7.5 to 12 metres, and optimised traffic and circulation areas ensure efficient transport flows and smooth operations within an intensive three-shift operating environment.

Special features

  • Approx. 20,000 m² of new logistics space
  • Loading tunnel (142.5 m × 20 m) accommodating up to five lorries simultaneously
  • 1,500 m² column-free canopy with a clear height of at least 5 m
  • Dedicated areas for high-voltage battery storage systems designed to the highest safety standards
  • Robust warehouse structure with a 15 m × 15 m grid and a clear internal height of at least 7.5 m (up to 12 m maximum)
  • Efficient circulation areas to accommodate high HGV traffic volumes
  • Short construction period despite complex technical requirements
Location

Stuttgart

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

SEGRO logistics park Berlin
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing
FRICKE Group logistics centre Tholey
  • Head office Paderborn
  • Logistics Buildings
  • Completed
ALCARO logistics centre Köln
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing