Skip to main content Skip to page footer

Aurelis Logistics Centre Kornwestheim

Object location

Kornwestheim

Service scope

Turnkey

Building type

Logistics Building

Floor space

Halle: 13.220 m² + Büro: 2.200 m²

Measurements

181 / 92 / 12,4 m

Construction period

Nov. 2015 to July 2016

Object description

In 2015, BREMER built for Aurelis Real Estate Management for the first time. On the steeply sloping site near the container terminal in Kornwestheim, a logistics building for a well-known automobile manufacturer is being constructed, planned by Kühnl & Schmidt Architekten AG from Karlsruhe. The hall is divided into two storage areas: a tire storage area and a wide-aisle storage area. Above the loading areas is the office and social block. Due to the heterogeneous subsoil, deep foundations are required, which are installed beneath the foundations and the industrial floor slab. The logistics hall is equipped with 11 ground-level gates and 3 rear unloading bays. The façade consists of horizontal ISO sandwich elements. An ESFR (Early Suppression, Fast Response) system is used for sprinkler technology.

Location

Stuttgart

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

SEGRO logistics park Berlin
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing
FRICKE Group logistics centre Tholey
  • Head office Paderborn
  • Logistics Buildings
  • Completed
ALCARO logistics centre Köln
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing