Skip to main content Skip to page footer

bauwo Cold Storage Facility Sottrum

Object location

Sottrum

Service scope

Turnkey

Building type

Cold Storage Facility

Floor space

20.000 m²

Measurements

216 / 92 / 14,00 m

Construction period

May 2018 to January 2019

Object description

BREMER is constructing a cold storage facility for REWE on behalf of bauwo. The storage areas are divided into two equal sections by a fire wall. There are a total of 41 loading units on two sides of the hall. 80% of the hall is refrigerated. The 900 m² office area consists of a two-story extension.

Location

Hamburg

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

Chefs Culinar logistics centre Büren
  • Head office Paderborn
  • Cold Storage Facilities
  • Ongoing
DFI distribution centre and office building in Kandel
  • Stuttgart
  • Office Buildings
  • Completed
Innstolz cold storage logistics centre and office building in Deggendorf
  • Ingolstadt
  • Office Buildings
  • Ongoing