Skip to main content Skip to page footer

bauwo Logistics Centre Bad Fallingbostel

Object location

Bad Fallingbostel

Service scope

Turnkey

Building type

Logistics Building

Floor space

22.600 m²

Measurements

228 / 85 / 12,50

Construction period

Sept. 2019 – Sept. 2020

Object description

BREMER is constructing the second phase of a logistics center in Bad Fallingbostel on behalf of bauwo. The logistics building will have two equally sized units, separated by a fire wall. A mezzanine with a depth of 12 meters will be placed at the front of the building. Each unit will have 9 dock levellers, a jumbo dock, and a ground-level gate available for delivery traffic.

A front office building will accommodate administrative workplaces, social areas, break rooms, and tea kitchens. The exterior areas will include 79 parking spaces for cars and 7 spaces for trucks, along with a covered bicycle storage area. The 25,000 m² hall will be used by the beverage manufacturer Coca-Cola.

Special features

Das Gebäude erhält von der DGNB e.V. (Deutsche Gesellschaft für Nachhaltiges Bauen) das Zertifikat Silber.

Location

Hamburg

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

SEGRO logistics park Berlin
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing
FRICKE Group logistics centre Tholey
  • Head office Paderborn
  • Logistics Buildings
  • Completed
ALCARO logistics centre Köln
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing