Skip to main content Skip to page footer

CONTINENTAL Production Facility Ingolstadt

Object location

Ingolstadt

Service scope

Partially Turnkey

Building type

Production Facility

Floor space

Hall: 12.375 m², Office: 9.000 m²

Measurements

76/16/21,6 m (Office West), 76/50/25,0 m (Hall), 76/16/21,6 m (Office East)

Construction period

September 2011 to June 2012

Object description

BREMER AG is building for Continental for the first time. The project involves the construction of a new production and administration building using a precast reinforced concrete structure. The CONTI DISTRIBUTION CENTER comprises two five-story office wings (east and west sides) and a three-story hall. The office wings are accessed via two staircases and elevator systems each. The building's façade features a curtain wall of smooth metal panels and aluminum window strips with external sun protection. The office wings are constructed from reinforced concrete with external thermal insulation. Throughout the building, the windows are integrated into the façade as aluminum mullion-transom constructions. The roof structure of the hall area consists of trapezoidal sheets with insulation and waterproofing, while the office areas have prestressed reinforced concrete floors.

Special features

Inner-city construction site. Execution includes shell construction, building envelope, and interior fit-out.

Location

Stuttgart

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

GRITEC Produktion + Büro
  • Karlsruhe
  • Office Buildings
  • Completed
WEIDENHAMMER Production Facility Zwenkau
  • Stuttgart
  • Office Buildings
  • Completed
SEMIKRON Production Facility Nürnberg
  • Stuttgart
  • Office Buildings
  • Completed