GIP Grundig logistics centre Nuremburg

Object location

Nuremburg

Service scope

Turnkey

Building type

Logistics centre

Floor space

Hall 1: 3000 m²; Hall 2: 1065 m²

Measurements

Hall 1: 50 / 60 / 12,80 m; Hall 2: 19 / 47 / 8,34 m

Construction period

Jan 2023 - Oct 2023

Object description

BREMER Ingolstadt delivered two turnkey halls for the tenant Wacker Neuson at the GIP (Grundig Industrial Park) in Nuremberg. The facilities comprise approximately 3,000 m² and 1,065 m² respectively. A key feature of the project is a crane runway equipped with two overhead cranes.

In the outdoor area, asphalt rehabilitation works, including a new drainage system, were carried out in five phases while operations remained fully active. Particular care had to be taken to ensure continuous access to a furniture warehouse throughout the construction period.

Wacker Neuson

»Nach über einem Jahr enger Zusammenarbeit möchten wir uns für die hervorragende Arbeit Ihrer Firma bedanken. Wir sind mit den Ergebnissen überaus zufrieden.«

Location

Ingolstadt

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

Chefs Culinar logistics centre Büren
  • Head office Paderborn
  • Cold Storage Facilities
  • Ongoing
FOUR PARX business campus Munich
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing
Reifen Müller Flagshipstore Stockstadt
  • Karlsruhe
  • Office Buildings
  • Completed