GIP Grundig logistics centre Nuremburg
Object location
Nuremburg
Service scope
Turnkey
Building type
Logistics centre
Floor space
Hall 1: 3000 m²; Hall 2: 1065 m²
Measurements
Hall 1: 50 / 60 / 12,80 m; Hall 2: 19 / 47 / 8,34 m
Construction period
Jan 2023 - Oct 2023
Object description
BREMER Ingolstadt delivered two turnkey halls for the tenant Wacker Neuson at the GIP (Grundig Industrial Park) in Nuremberg. The facilities comprise approximately 3,000 m² and 1,065 m² respectively. A key feature of the project is a crane runway equipped with two overhead cranes.
In the outdoor area, asphalt rehabilitation works, including a new drainage system, were carried out in five phases while operations remained fully active. Particular care had to be taken to ensure continuous access to a furniture warehouse throughout the construction period.
Wacker Neuson
»Nach über einem Jahr enger Zusammenarbeit möchten wir uns für die hervorragende Arbeit Ihrer Firma bedanken. Wir sind mit den Ergebnissen überaus zufrieden.«
Ingolstadt
You are impressed by our reference and would like to know which BREMER office managed this project?
Learn moreSimilar projects