Skip to main content Skip to page footer

Goodman Logistics Centre Hamm-Rhynern

Object location

Hamm-Rhynern

Service scope

Turnkey

Building type

Logistics Building

Floor space

44.255 m²

Measurements

282 / 156 / 12,45 m

Construction period

Jan. 2015 to Aug. 2015

Object description

The ground-floor logistics hall is divided by fire walls into a total of 5 fire compartments (units 1-4 + office extension). A 2-storey administration building with offices and social rooms with a total gross floor area of 569.50 m² has been erected in front of Unit 1. Additional office and social rooms with a gross floor area of 124.00 m² have been created in Unit 3. A total of 50 loading units are being built on the east and west sides of the logistics hall.

Location

Head office Paderborn

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

FRICKE Gruppe Logistikzentrum Tholey
  • Head office Paderborn
  • Logistics Buildings
  • Completed
ALCARO Logistikzentrum Köln
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing
SEGRO Logistikpark Berlin
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing