Skip to main content Skip to page footer

GRITEC production + office

Object location

Waghäusel

Service scope

Turnkey

Building type

Office and production

Floor space

5,919 m²

Measurements

41 / 131 / 10,95 m

Construction period

Jan 2023 - Oct 2023

Object description

BREMER Karlsruhe constructed a new production facility with an adjoining office building for the client GRITEC.

The development comprises a basement-level office annex and two production halls featuring mezzanine floors. The staff welfare and social facilities are located within the mezzanine areas. The roof of the production halls is equipped with a photovoltaic (PV) system, while the office roof has been designed as a green roof.

A gatehouse is located within the external grounds. In Production Hall 2, a KASTO bar storage system was integrated. A dedicated HGV circulation route was constructed around the entire building to allow full truck access. The two canopies, which run along the full length of the building on either side, each have a depth of 6 metres.

Location

Karlsruhe

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

R+M Suttner production and development site in Lemgo
  • Head office Paderborn
  • Office Buildings
  • Completed
Mateco workshop hall with office and staff facilities in Alpen
  • Stuttgart
  • Office Buildings
  • Completed
mateco workshop hall with office and staff welfare facilities in Rendsburg
  • Stuttgart
  • Office Buildings
  • Completed