Heinz Office Building, Parking Garage and Testing Hall in Ingolstadt

Object location

Ingolstadt

Service scope

Turnkey

Building type

Office building, parking garage, testing hall

Floor space

Total area approx. 8,145 m² (thereof approx. 4,325 m² commercial usable area)

Measurements

Office building: 65.70 / 17.50 / 13.50 m Parking garage: 63.00 / 16.50 / 6.30 m Testing hall: 12.90 / 12.90 / 7.50 m

Construction period

July 2019 – June 2020

Object description

BREMER Süd successfully completed a versatile, turnkey building complex for Heinz in Ingolstadt. The construction project comprises a three-story office building, a two-story parking garage, and a functional vehicle testing hall. Following a compact construction period of just twelve months, the project was completed on schedule in June 2020.

The property offers a total floor area of around 8,145 square meters, of which approximately 4,325 square meters are designated as commercial usable space. By thoughtfully combining modern administrative spaces, directly connected parking facilities, and specialized testing hall infrastructure, the complex unites diverse functional requirements on a single site. A special connection to the project is also reflected in BREMER's own occupancy: the BREMER Ingolstadt branch has moved into office space on the second floor of the building.

With the successful completion of this project, BREMER Süd once again demonstrates its expertise in the rapid and tailored realization of complex, multifunctional commercial properties.

Special features

  • Total floor area: 8,144.87 m² (commercial usable area: 4,325.14 m²)
  • Three-story office building (65.70 x 17.50 x 13.50 m)
  • Two-story parking garage (63.00 x 16.50 x 6.30 m)
  • Integrated vehicle testing hall (12.90 x 12.90 x 7.50 m)
  • Compact turnkey realization in just 12 months
  • Own occupancy: BREMER Ingolstadt is a tenant on the 2nd floor

     

Location

Ingolstadt

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

B OFFICE office building in Bochum
  • Rhein-Ruhr
  • Office Buildings
  • Ongoing
Haus+Co Office and Kindergarden
  • Stuttgart
  • Office Buildings
  • Completed
R+M Suttner production and development site in Lemgo
  • Head office Paderborn
  • Office Buildings
  • Completed