Skip to main content Skip to page footer

Jungheinrich Logistics Centre Sachsenheim

Object location

Sachsenheim

Service scope

Turnkey

Building type

Logistics Building

Floor space

Hall: 3.240 m², Office: 1.840 m²

Measurements

Hall: 62/54/9,5 m, Office: 14,5/41,5/10,5 m

Construction period

Apr. 2013 to Oct. 2013

Object description

For the first time, BREMER AG is building two new distribution centers for Jungheinrich at the same time. The project involves the construction of a new service center with a warehouse and workshop area as well as an adjoining three-storey administration building as a prefabricated reinforced concrete structure. The roof construction consists of trapezoidal sheet metal with insulation and sealing. The façade of the administration building consists of a curtain-type sheet metal façade with aluminum window strips. The ceiling in the office is a solid ceiling with insulation and waterproofing. The adjoining office building is connected to the hall by means of a connecting structure and a showroom. The building is heated and cooled using geothermal energy. The offices and the showroom are equipped with heating and cooling ceilings.

The northern area of the hall is accessed via a delivery yard, which is partially covered.
In the southern area, below the office, there are parking spaces and green areas.
In the western area, there is a large sloped drainage trough for draining rainwater.
 

Special features

Geothermal energy, drainage trough, heating & cooling ceilings, deep foundations

Location

Stuttgart

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

Weidenhammer Logistics Centre Hockenheim
  • Stuttgart
  • Office Buildings
  • Completed
Panalpina Logistics Centre Neufahrn
  • Stuttgart
  • Office Buildings
  • Completed
Wortmann Logistics Centre Detmold
  • Head office Paderborn
  • Office Buildings
  • Completed