Skip to main content Skip to page footer

Loft Estate Logistics Building Butzbach

Object location

Butzbach

Service scope

Turnkey

Building type

Logistics Building

Floor space

29.900 m²

Measurements

201 / 128 / 12 m

Construction period

Aug. 2014 to Aug. 2015

Object description

The design of the façade is a special stylistic element: While the high-bay warehouse is fitted with vertical ISO panels, the other hall areas are set off by horizontal ISO panels. The administration area has a special façade to clearly identify its function and the entrance for visitors. The attractive appearance of the precast reinforced concrete elements from BREMER underlines the user's demand for the highest quality and individual design.

Special features

Modern look for complete cosmetics logistics. Conveniently located between the A5 and A45 motorways, BREMER is building a logistics center in Butzbach for the storage, order picking and distribution of cosmetic products. In addition to two hall areas, a high-bay warehouse and a two-storey administration area, a mezzanine level that extends over the entire loading area has also been integrated into the 29,000 m² facility. In addition, the turnkey handover at a fixed price includes complex special foundation measures as well as the shell construction of the high-bay warehouse and the construction of the entire outdoor facilities.

Location

Head office Paderborn

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

Baur Hermes Fulfilment Shuttle-Lager Altenkunstadt
  • Ingolstadt
  • Logistics Buildings
  • Completed
GIP Grundig LOG Nürnberg
  • Ingolstadt
  • Logistics Buildings
  • Ongoing
VALOR Logistikzentrum Ahrensfelde
  • Berlin-Brandenburg
  • Building in existing struktures
  • Ongoing