Transthermos Cold Storage Facility Markgröningen
Object location
Markgröningen
Service scope
Turnkey
Building type
Cold Storage Facility
Floor space
4.350 m²
Measurements
93 / 47 / 16,6 m
Construction period
Aug. 2010 to Mar. 2011
Object description
As part of the expansion of its temperature-controlled logistics network, Transthermos constructed a state-of-the-art cold storage facility in Markgröningen. The property was delivered by BREMER Stuttgart as a turnkey project under a general contractor model. The extension provides approximately 4,350 m² of usable space and was completed within just eight months.
The cold store is designed for the storage and handling of temperature-controlled goods and meets the highest standards of energy efficiency and food safety. Strategically located in the Greater Stuttgart area, the facility strengthens the company’s logistics infrastructure in southern Germany.
Stuttgart
You are impressed by our reference and would like to know which BREMER office managed this project?
Learn moreSimilar projects