Skip to main content Skip to page footer

Panalpina Logistics Centre Neufahrn

Object location

Neufahrn

Service scope

Turnkey

Building type

Logistics Building

Floor space

11.850 m²

Measurements

Büro: 61,4/14,0/15,0 + 23,7/23,0/8,0 Halle: 109,9/71,6/14,7

Construction period

November 2009 – November 2010

Object description

The office building consists of four floors with a two-story connecting structure to the warehouse. The entire structure is built with precast concrete components, featuring aluminum window bands and a ventilated Eternit facade. The warehouse is also constructed from precast concrete with a central column row and includes concrete sandwich elements and metal cassette facade sections. Heating is provided by a geothermal system using a ground-water heat pump, while cooling is managed through a plate heat exchanger. The office building is equipped with a mechanical ventilation system.

Special features

This project is BREMER’s third for Panalpina Welttransport GmbH, highlighting the building's advanced technical systems, particularly its exclusive use of geothermal energy for heating and cooling.

Location

Stuttgart

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

Weidenhammer Logistics Centre Hockenheim
  • Stuttgart
  • Office Buildings
  • Completed
Jungheinrich Logistics Centre Sachsenheim
  • Stuttgart
  • Office Buildings
  • Completed
Wortmann Logistics Centre Detmold
  • Head office Paderborn
  • Office Buildings
  • Completed