Panalpina Logistics Centre Neufahrn
Object location
Neufahrn
Service scope
Turnkey
Building type
Logistics Building
Floor space
11.850 m²
Measurements
Büro: 61,4/14,0/15,0 + 23,7/23,0/8,0 Halle: 109,9/71,6/14,7
Construction period
November 2009 – November 2010
Object description
The office building consists of four floors with a two-story connecting structure to the warehouse. The entire structure is built with precast concrete components, featuring aluminum window bands and a ventilated Eternit facade. The warehouse is also constructed from precast concrete with a central column row and includes concrete sandwich elements and metal cassette facade sections. Heating is provided by a geothermal system using a ground-water heat pump, while cooling is managed through a plate heat exchanger. The office building is equipped with a mechanical ventilation system.
Special features
This project is BREMER’s third for Panalpina Welttransport GmbH, highlighting the building's advanced technical systems, particularly its exclusive use of geothermal energy for heating and cooling.
Stuttgart
You are impressed by our reference and would like to know which BREMER office managed this project?
Learn more