SEMIKRON Production Facility Nürnberg
Object location
Nürnberg
Service scope
Turnkey
Building type
Production Facility
Floor space
Production: 9.500 m² / Office: 1.800 m²
Measurements
Production: 79 / 50 / 13,25 // Office: 60 / 19 / 17,40 m
Construction period
May 2016 to Jul. 2017
Object description
The building consists of two parts, C2 and C3, which serve as production and storage halls. These are separated by a firewall. Both halls are single-storey except for a section of hall C2, which has a mezzanine level at + 7.50 m above ground level. A 4-storey head-end building with office and social areas is planned on the west side of component C3 and separated from halls C2 and C3 by a firewall.
Location
Stuttgart
You are impressed by our reference and would like to know which BREMER office managed this project?
Learn more