TTI logistics centre, office building and multi-storey car park extension in Maisach-Gernlinden
Object location
Maisach-Gernlinden
Service scope
Turnkey
Building type
Logistics centre, office building and multi-storey car park extension
Floor space
34.100 m²
Construction period
March 2025 – November 2026
Object description
The BREMER Stuttgart GmbH is delivering the structural expansion of the European Distribution Centre (EDC) and headquarters of TTI IP&E Europe in Maisach-Gernlinden as the general contractor. The project covers a total area of approximately 51,200 m² and combines state-of-the-art logistics, office and parking facilities with a strong focus on technological innovation and sustainability.
As part of the expansion, a logistics facility of approximately 27,800 m² is being constructed, divided into three fire compartments. Including mezzanine levels and fitted-out areas, this section will provide an additional 3,000 m² of usable space. The development also includes an office building of approximately 3,300 m², extending over 2.5 storeys and designed to create a modern working environment. In addition, the existing multi-storey car park will be expanded to accommodate the increased demand for parking spaces.
A particular highlight of the completed facility will be the largest AutoStore system in the world, which is planned to be installed on a specially designed elevated platform structure. Consequently, the construction phase places special emphasis on meeting the stringent requirements for the flatness and load-bearing capacity of the floor slabs in order to provide the technical foundation for the automated storage system.
Image and video copyright: METRIK Architekten.
Stuttgart
You are impressed by our reference and would like to know which BREMER office managed this project?
Learn moreSimilar projects