Skip to main content Skip to page footer

VIB Logistics Centre Grossmehring

Object location

Großmehring

Service scope

Turnkey

Building type

Logistics Building

Floor space

51.000 m²

Measurements

225 / 226 / 12,54 m

Construction period

Apr. 2015 to Sep. 2015

Object description

The logistics building consists of 6 warehouses separated by firewalls. Mezzanine floors with office space are located at the ends. The hall grid is 9.00 m x 37.50 m in a prefabricated concrete construction. The halls are equipped with LED lighting. The building has 3 elevators and charging stations for e-cars and e-bikes. There are 40 units per hall section, 6 dock levellers and 1 side discharge.

Location

Stuttgart

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

ALCARO Logistikzentrum Köln
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing
FRICKE Gruppe Logistikzentrum Tholey
  • Head office Paderborn
  • Logistics Buildings
  • Completed
SEGRO Logistikpark Berlin
  • Head office Paderborn
  • Logistics Buildings
  • Ongoing