Skip to main content Skip to page footer

Vinnemeier Logistics Centre Rietberg

Object location

Rietberg

Service scope

Precast Elements

Building type

Logistics Building

Floor space

26.500 m²

Measurements

192 / 110 / 12,50 m

Construction period

Feb. 2019 to Apr. 2019

Object description

The wholesale company Vinnemeier is building a central warehouse on Langenberger Strasse in Rietberg with 20,000 m² of land and 25,000 m² of floor space. The halls, which have an internal column grid of 12 x 24, are separated in the middle by a firewall. The clear hall height is approx. 10.20 m. The main entrance with staircase and elevator shaft is located in the area of the central firewall. The entrance is emphasized by a porch, which also connects the mezzanine areas behind it. These are arranged over two storeys across the entire 192 m width of the hall and are 14 m deep. Prestressed TT ceilings are used here. Due to the lower load on the office level above, prestressed concrete hollow core slabs can be used for the ceiling system.

Location

Head office Paderborn

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

Gerry Weber Logistics Centre Halle / Westfalen
  • Head office Paderborn
  • Precast Elements
  • Completed
Nobilia Production Facility Verl
  • Head office Paderborn
  • Precast Elements
  • Completed
R+M Suttner Produktions- und Entwicklungsstandort Lemgo
  • Head office Paderborn
  • Office Buildings
  • Completed