Skip to main content Skip to page footer

Wilhelm Gienger Logistics Centre Mannheim

Object location

Mannheim

Service scope

Turnkey

Building type

Logistics Centre

Floor space

27.900 m²

Measurements

205 / 105 / 13,75 m

Construction period

Jul. 2016 to Jul. 2017

Object description

BREMER is building for the second time for the wholesale company Gienger, this time in Mannheim.
The building will be the new company headquarters of Wilhelm Gienger Mannheim KG and consists of a warehouse with a 3-storey front building with exhibition, training and sales areas. Two mezzanine floors with offices and social rooms are arranged above the outgoing goods area with 35 loading gates. The façades are divided into concrete sandwich elements and ISO sandwich façades in graduated shades of gray. The exhibition area on the first floor has a prestigious window front framed by a projecting monitor in aluminum composite panels.
As one of the leading specialist wholesalers for building technology, the client attaches great importance to modern building technology that meets ecological and economic requirements. The hall and ABEX will be heated via the concrete core activation system integrated into the floor slab. In addition, underfloor heating is planned for the exhibition area on the 1st floor and heating and cooling ceilings in the office and training rooms. Energy will be generated from gas condensing boiler systems, air-water heat pumps and a combined heat and power unit.
A covered outdoor storage area including a filling station will be built outside.
 

Location

Stuttgart

You are impressed by our reference and would like to know which BREMER office managed this project?

Learn more

Similar projects

Baur Hermes Fulfilment Shuttle-Lager Altenkunstadt
  • Ingolstadt
  • Logistics Buildings
  • Completed
GIP Grundig LOG Nürnberg
  • Ingolstadt
  • Logistics Buildings
  • Ongoing
VALOR Logistikzentrum Ahrensfelde
  • Berlin-Brandenburg
  • Building in existing struktures
  • Ongoing