CENTROTEC logistics centre in Siegenburg
Object location
Siegenburg
Service scope
Turnkey
Building type
Logistics centre
Floor space
ca. 25.000 m²
Measurements
Hall A: 211 / 73 / 12 m; Hall B: 30,6 / 61,10 / 12,60 m
Construction period
August 2023 – August 2024
Object description
For CENTROTEC SE, BREMER Süd GmbH delivered a modern logistics centre in Siegenburg, Lower Bavaria, for its Ingolstadt site. The project was executed on a turnkey basis and successfully completed in August 2024.
With a gross floor area of approximately 25,000 m², the logistics centre comprises two warehouse buildings and benefits from a strategically advantageous location directly adjacent to the motorway. The challenging topography of the site, situated on a hillside, presented unique planning and construction requirements, all of which were addressed through technically sophisticated and architecturally compelling solutions.
In addition to providing highly functional logistics space, the building was designed to create distinctive architectural features both inside and out. The combination of efficient logistics operations, high-quality design, and complex geotechnical engineering solutions highlights BREMER’s comprehensive expertise as a turnkey construction partner.
Special features
- Turnkey construction of a logistics centre
- Total gross floor area of approximately 25,000 m²
- Two warehouse buildings in close proximity to the motorway
- Design and construction on a challenging sloping site
- Distinctive architectural features both internally and externally
- Special foundation works using the DYNAIV® ground improvement method
- Slope stabilisation for Warehouse B executed using reinforced earth construction