Südmetall Maisach Production Facilitiy
Object location
Maisach
Service scope
Turnkey
Building type
Production Facility
Floor space
Hall 1: 2.531 m² // Hall 2: 2.857 m²
Measurements
Hall 1: 70 / 37 / 11,10 m // Hall 2: 60 / 30 / 11,10 m
Construction period
May 2019 to Apr. 2020
Object description
BREMER has been contracted to construct an estate for Leonhard Grundstücksverwaltungs GbR consisting of 2 warehouses/production halls, a 3-storey office building and outdoor facilites. The three buildings stand in a row, covered passages are in between. Projecting roofs made from steel are attached to the facades.
Südmetall Maisach
»Wir durften eine sehr angenehme Zusammenarbeit mit BREMER erleben, welche durch die zuverlässige, zielgerichtete, kompetente und partnerschaftliche Zusammenarbeit geprägt war.«
Ingolstadt
You are impressed by our reference and would like to know which BREMER office managed this project?
Learn more